Weekly Street Work Schedule – October 6 – October 10, 2025
- Catch Basin Cleaning
- Concrete crew pouring misc. sidewalks, Catch Basins and curbs
- Street sweeping
- Road patching
- Cleaning ditches and storm grates
- Storm Line repair on Barrows St. at English St.
- Contractor Work – Hall Ave., from Harding Ave. to 3rd
- BPU on S. Main St., repairing sidewalks & curbs
- Pave Sabin St.
- Preparing equipment for leaf collection
- Preparing equipment for salt and brine use
- Pipe and curb work on Isabella Ave.
- Sidewalk repairs
- Repair D/I’s on Arterial
- Repair S/L on Foote Ave.
- Street repair on Sampson St. and Newland Ave.
- Street repair on Palmer St. and Highland Ave.
- Burr Pl. – dig out of bad spots (VanBuren St. to Price St.)
- Grading and removing concrete from Crawford site on Allen St.
- Leaf collection with vac truck