Weekly Street Work Schedule – August 11 – August 15, 2025
- Landscape curbs on Charlotte Ave., Towner Ave., Bowen St., and Thayer St.
- Pave prep on Chandler St., Benedict Ave., and Linwood Ave.
- Catch Basin Cleaning
- Concrete crew pouring misc. sidewalks, Catch Basins and curbs
- Street sweeping
- Road patching
- Start Strong St. reconstruction
- Contractor to pour curbs on Barrows St.
- Paving base & binder on Barrows St.
- Contractor digging and pouring misc. curbs on W. Virginia Blvd.
- Adding Catch Basin on Benedict Ave.
- Adding Catch Basin on Sturges St.
- Catch Basin repair on Euclid Ave.
- Curb & Catch Basin Repair on Towner Ave.
- Pouring Catch Basin tops on Chandler St.
- Repair D/I on Hebner St., and Valleyview Ave.
- Pave Chandler St., and Linwood Ave.
- Contractor Work – curb and brick repair Barrows St., from Benedict to Allen
- Contractor Work – Clinton St., from 3rd to 4th
- Contractor Work – Hall Ave., from Harding Ave. to 3rd
- BPU on S. Main St., repairing Traffic Signal, storm drain, and sidewalks
- Riverwalk – Replacement and repair of Park Amenities
- Panzarella Park – Deck replacement