Weekly Street Work Schedule – September 2 – September 9, 2025
- Landscape curbs on Barrows St.
- Pave prep on Benedict Ave.
- Catch Basin Cleaning
- Concrete crew pouring misc. sidewalks, Catch Basin’s and curbs
- Street sweeping
- Road patching
- Continuing Strong St. reconstruction
- Barrows St. paving prep
- Contractor digging and pouring misc. sidewalks and driveways on Barrows St.
- Adding Catch Basin on Benedict Ave.
- Catch Basin repair on Euclid Ave.
- Curb & Catch Basin Repair on Towner Ave.
- Repair D/I on Hebner St. and Valleyview Ave.
- Contractor Work – curb and brick repair Barrows St., from Benedict to Allen
- Contractor Work – Clinton St., from 3rd to 4th
- Contractor Work – Hall Ave., from Harding Ave. to 3rd
- BPU on S. Main St., repairing Traffic Signal, storm drain, and sidewalks
- Removing and pouring news steps at Allen Park Bandshell
- Repair catch basin at Foote Ave. and Harrison St.
- Repair S/L on Jones & Gifford Ave.
- Repair D/I at Arterial & Cole Ave.
- Reconstructing Barrows Ave. – Allen St. to Benedict Ave.
- Riverwalk – Replacement and repair of Park Amenities
- Panzarella Park – Deck replacement